The Chester Metropolitan District will hold a public hearing in the Chester County Library’s Jean M. White Room, located at 100 Center Street at 5:00 P.M. on June 27, 2018 for the purpose of public input concerning the proposed Budget for the fiscal year 2017-2018.
The Chester Metropolitan District has contracted with Raftelis of Charlotte, North Carolina to develop a new water service rate schedule, as outlined below.
This new water service rate schedule will go into effect for all customers beginning September 1, 2018.
Water Service Base Rate |
|
(Based on Meter Size) |
|
3/4″ | $ 14.35 |
1″ | $ 21.52 |
1.5″ | $ 39.26 |
2″ | $ 60.64 |
3″ | $ 110.56 |
4″ | $ 181.87 |
6″ | $ 359.96 |
8″ | $ 573.76 |
10″ | $ 823.27 |
Volumetric Usage Rate |
|
per 1,000 Gallons | $ 7.19 |
The following fees will go into effect July 1, 2018:
Fire Line Fees | |
Current | Proposed | |
10” | $ 203.95 | 218.00 |
8” | $ 193.15 | 207.00 |
6” | $ 163.44 | 175.00 |
4” | $ 135.07 | 145.00 |
Tap Fee | |
Current | Proposed | |
1″ or smaller, simple install | $ 1,391.00 | 1488.00 |
All others — Cost of Installation | |
Other Fees | |
Current | Proposed | |
Non-Payment Fee* | $ 45.00 |
After Hours Reconnect Fee | $ 65.00 | 69.00 |
Pulled Meter Fee | $ 65.00 | 69.00 |
Late Fee | $ 3.00 |
Engineering Fees |
||||
Backflow Test Fee | $ 12.00 | per result | ||
Plan Review Fees | See Review Fee Schedule | |||
Hydrant Meter Fees** |
||||
Refundable Deposit | $ 100.00 | |||
Single Day Permit | $ 50.00 | |||
15-Day Permit | $ 100.00 | |||
30-Day Permit | $ 200.00 | renewable before expiration | ||
Relocation Fee | $ 35.00 |
*Non-Payment Fee – replaces the “Reconnect Fee”
** Hydrant Meter Fees – replaces the “Hydrant Meter Permit Fee”
FY 2017-2018 FY 2018-2019 Percent Change
Revenue $6,437,536 $7,221,548 +12.17%
Expenditures $6,437,536 $7,221,548 +12.17%
The Chester Metropolitan District does not receive revenue through taxation.