Water Capital Recovery Fees Project

Chester Metropolitan District

 

The Chester Metropolitan District presents for public view and comment the findings of the Water Capital Recovery Fees study. Below are the proposed fees, as well as a copy of the full report. A public hearing is scheduled for Thursday, May 31, 2018 at 6:00 PM at the Gateway Conference Center in Richburg to discuss this project. Please direct any advance comments to the included form or call our office at (803) 385-5123.

For additional information, please visit our Capital Recovery Category.


 

Proposed Capital Recovery Fees

Single ¾” Water Service Connection                         $ 1,045.00 (per each)

Single 1” Water Service Connection                          $ 1,740.00 (per each)

Single 2” Water Service Connection                          $ 5,575.00 (per each)

 

Use the formula below to calculate the capital recovery fee (CRF) for water meter sizes 3” to 10” based on daily water demands requested by the owner/developer and detailed in Chester Metropolitan District’s Willingness and Capability Letter to the owner/developer.

 

CRF = (Water Demand, gal/day) x 1.4 x 1.25 x $1.99

System Peaking Factor = 1.25

Water Loss Factor = 1.4

 

Proposed Collection of Capital Recovery Fees

Single ¾” Water Service Connection – Capital Recovery Fees will be paid at the time that the tap fees are paid.

Residential Subdivisions – 50% of the Capital Recovery Fees will be paid up front based on the number of lots on the approved plat and 50% paid at the time that the tap fees are paid.

Commercial/Industrial Water Connections – 100% of the Capital Recovery Fee will be paid at the time of the issuance of the Willingness and Capability Letter by Chester Metropolitan District.  Fees will be based on daily water demands provided by the owner/developer’s design engineer.  If, after one year, the actual daily water demands are in excess of the design engineer’s estimation which were used to determine CRF’s, the owner/developer will be assessed additional CRF’s to cover the excess water demand.

Fire Supply Line Connections – 100% of the Capital Recovery Fee will be paid at the time of the issuance of the Willingness and Capability Letter by Chester Metropolitan District.  Fees will be based on the quantity of water required over the specified period of time necessary to meet fire code requirements.

Download a copy of the full Water Capital Recovery Fees Report.

 


 

Public Comment

All fields are required for submission. Information collection is for analytical purposes only. Your information will remain confidential and will not be given, sold, or otherwise transferred to another party for any purpose.

Please note: this form is for Capital Recovery Project Comments only. The recipient will not respond to any other comments made using this form.

Thank you for participating in our project!

PUBLIC COMMENT IS NOW CLOSED FOR THIS PROGRAM.